The Environmental Agency introduced new rules on sewage treatment January 1st 2015. The general binding rules state that you must use a small #sewage treatment plant to treat the sewage if you’re discharging to a surface water such as a stream or river.

The new rules also lay out a requirement that all septic tanks discharging directly to a #surface water must be replaced or upgraded to sewage treatment plants which meet the required standards. All new sewage treatment plants must by installed by January 1st 2020.

For more information please contact us on 0151 495 1929.